Client: Main Roads WA
Road and Bridge

Margaret River Perimeter Road Stage 2

The Project included bridge structures and a 7km perimeter road extending from the Airport Access Road north of Margaret River to the Bussell Highway south of Margaret River.

Project Information
  • Client
    Main Roads WA
  • Sector
    Transport
  • Value
    28m
  • Location
    Western Australia
  • Contract Model
    Construct
  • Completion Date
    2019

The works consisted of the construction of:

  • 2km of perimeter road to connect to Stage One at Rosa Brook intersection
  • 3km long John Archibald Drive and roundabout connection with the perimeter road
  • A 100-metre-long road-bridge consisting of piled foundations, in-situ concrete abutments, piers, steel girders and a precast deck with in-situ topping slab
  • A pedestrian bridge consisting of rock anchors, in-situ foundations and steel bridge span forms part of the Darch walk trail.

Key Achievements

Major tie-in/staging requirements at Bussell Highway Northern Intersection collaboratively developed with local stakeholders and Main Roads reduced the impact to the local traffic network.